FICTIONAL EXAMPLE. The organisation, documents, figures and events are invented.

Committee paper: replacing the branch cash-recycler contract

Organisation settings (fictional)

The brief (fictional)

Author pastes a business case (S1), a risk assessment by the operational risk owner (S2) and a note of a procurement meeting (S3). Legal has not been consulted. The author gives the paper number and meeting date.

DRAFT. Classification: Restricted. Prepared with corp-board-paper v1.0.0. Not signed off.

Paper ORC-26-14. Operational Risk Committee, meeting of 18 November. For decision. Sponsor: Head of Branch Operations.

Recommendation

That the Committee:

  1. approves Option B, replacing the cash-recycler maintenance contract from 1 April [S1 p.2];
  2. notes that Legal has not yet reviewed the draft contract [UNVERIFIED: author to confirm Legal review date].

Summary

The current contract ends on 31 March and the supplier has given notice it will not renew [S1 p.1]. Doing nothing leaves 42 branches without maintenance cover from April [S1 p.3]. The Committee is asked to choose between a one-year bridge and a three-year replacement.

Options

OptionBenefitCostMain risk
A. Do nothingNo spendNil42 branches uncovered from April [S1 p.3]
B. Three-year replacement (recommended)Fixed price for three years [S1 p.4]1.2m over three years [S1 p.4]Transition during the Easter peak [S2 item 3]
C. One-year bridgeKeeps supplier choice open0.55m for one year [S1 p.5]Second tender within nine months [S3]

Financial impact

1.2m over three years, funded from the approved branch operating budget [S1 p.4].

Risk and appetite

The risk owner rates the transition risk Medium, inside the stated appetite for branch availability [S2 item 3].

Consultation

Procurement, 3 October: "Option B is the preferred route" [S3]. Legal: none supplied.

Conflicts of interest

None supplied: author to confirm.

Implementation

Contract signature by 15 December; transition plan to this Committee in February [S1 p.6].

Sources. S1 Business case v3. S2 Risk assessment, 28 September. S3 Procurement meeting note, 3 October.
Unverified. Legal review date.
Sign-off. Head of Branch Operations: ____ Date: ____. Chief Risk Officer: ____ Date: ____.